IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 496 Steam And Air-conditioning Supply
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1001 # 02 Y:2022 02 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,550 $24,900 Not Implemented
CM1001 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $190 $1,100 Implemented
CM1001 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $3,950 Implemented
CM1001 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $1,100 $3,300 Not Implemented
CM1001 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,400 $14,000 Implemented
OR0707 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $1,431 $5,365 Implemented
OR0707 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,481 $19,583 Implemented
OR0707 # 04 Y:2018 04 2018 REDUCE FLUID FLOW RATES $6,509 $7,384 Implemented
OR0707 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $7,954 $8,965 Implemented
OR0707 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,884 $53,702 Implemented
OR0707 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,086 $32,488 Not Implemented
OR0695 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,343 $10,981 Not Implemented
OR0695 # 02 Y:2017 02 2017 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $13,796 $30,600 Not Implemented
OR0695 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,279 $43,386 Implemented
DL0119 # 06 Y:2013 06 2013 USE SYNTHETIC LUBRICANT $5,466 $1,000 Not Implemented
DL0119 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,947 $3,000 Not Implemented
DL0119 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,382 $20,000 Not Implemented
DL0119 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,978 $95,000 Not Implemented
DL0119 # 02 Y:2013 02 2013 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $45,282 $138,000 Not Implemented
DL0119 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,490 $34,000 Not Implemented