IAC Assessment: OR0707
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0707
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Water
NAICS 221330 - Steam and Air-Conditioning Supply
SIC 4961 - Steam And Air-conditioning Supply
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 7,000
Annual Production 12,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,156,311 37,830,013 kWh $0.06
Electricity Demand $158,608 61,003 kW-months/year $2.60
Electricity Fees $(-1,869,325) - $ -
Natural Gas $786,893 378,894 MMBtu $2.08
TOTAL ENERGY COSTS $1,232,487
RECOMMENDED SAVINGS* $56,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,259
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,086
Cost:
$32,488
$21,780 382,114 $1,306 502 - - - - - - $21,780
382,114
kWh
$1,306
502
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,884
Cost:
$53,702
- - - - $14,884 3,666 - - - - -
-
kWh
-
-
kW-months/year
$14,884
3,666
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,954
Cost:
$8,965
- - - - $7,954 1,959 - - - - -
-
kWh
-
-
kW-months/year
$7,954
1,959
MMBtu
-
-
$
-
-
$
04: 2.5123 REDUCE FLUID FLOW RATES Savings:
$6,509
Cost:
$7,384
$6,008 105,412 $501 193 - - - - - - $6,008
105,412
kWh
$501
193
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,481
Cost:
$19,583
$1,782 31,269 $111 43 - - $739 - $(-151) - $1,782
31,269
kWh
$111
43
kW-months/year
-
-
MMBtu
$739
-
$
$(-151)
-
$
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$1,431
Cost:
$5,365
$1,301 22,829 $130 50 - - - - - - $1,301
22,829
kWh
$130
50
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,345
Cost:
$127,487
$30,871 541,624 $2,048 788 $22,838 5,625 $739 - $(-151) - $30,871
541,624
kWh
$2,048
788
kW-months/year
$22,838
5,625
MMBtu
$739
-
$
$(-151)
-
$
TOTAL IMPLEMENTED Savings:
$33,259
Cost:
$94,999
$9,091 159,510 $742 286 $22,838 5,625 $739 - $(-151) - $9,091
159,510
kWh
$742
286
kW-months/year
$22,838
5,625
MMBtu
$739
-
$
$(-151)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost