Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 50 | Wholesale Trade |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0377 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $4,594 | $7,127 | Not Implemented |
UM0377 # 09 Y:2010 | 09 | 2010 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $626 | $627 | Not Implemented |
UM0377 # 08 Y:2010 | 08 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,554 | $11,607 | Not Implemented |
UM0377 # 05 Y:2010 | 05 | 2010 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $47,701 | $4,568 | Not Implemented |
UM0377 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,767 | $700 | Not Implemented |
UM0377 # 06 Y:2010 | 06 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,037 | $8,500 | Not Implemented |
UM0377 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $421 | $200 | Not Implemented |
UM0377 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $71 | $10 | Not Implemented |
UM0377 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,826 | $600,000 | Not Implemented |
DL0059 # 02 Y:2010 | 02 | 2010 | USE COMPRESSOR AIR FILTERS | $6,340 | $12,965 | Implemented |
DL0059 # 03 Y:2010 | 03 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,300 | $650 | Not Implemented |
DL0059 # 04 Y:2010 | 04 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,931 | $40 | Implemented |
DL0059 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,616 | $400 | Implemented |
DL0059 # 06 Y:2010 | 06 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $2,552 | $1,038 | Implemented |
DL0059 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $580 | $40 | Implemented |
DL0059 # 01 Y:2010 | 01 | 2010 | INSTALL TIMERS AND/OR THERMOSTATS | $5,800 | $520 | Implemented |
UD0818 # 13 Y:2010 | 13 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,977 | $0 | Not Implemented |
UD0818 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Not Implemented |
UD0818 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $16,190 | $0 | Not Implemented |
UD0818 # 09 Y:2010 | 09 | 2010 | USE OPTIMUM TEMPERATURE | $7,200 | $0 | Implemented |
UD0818 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,876 | $0 | Implemented |
UD0818 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,791 | $1,460 | Not Implemented |
UD0818 # 11 Y:2010 | 11 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $4,241 | $0 | Not Implemented |
UD0818 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,405 | $0 | Not Implemented |
UD0818 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $5,865 | $0 | Implemented |