Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 501 Motor Vehicles, Parts, And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM17 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,804 $2,090 Not Implemented
MUCM17 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,295 $791 Not Implemented
MUCM17 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $170 Implemented
MUCM17 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $117 $299 Not Implemented
MUCM17 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $26,757 Implemented
MUCM17 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5 $16 Not Implemented
OK0818 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $8,413 $91,000 Implemented
OK0818 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,735 $29,626 Not Implemented
OK0818 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,786 $40,503 Not Implemented
OK0818 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $309 $2,707 Not Implemented
OK0818 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,726 $1,635 Implemented
OK0818 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,355 $4,015 Not Implemented
OK0818 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $386 Not Implemented
OK0818 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $482 $2,104 Implemented
OK0818 # 09 Y:2011 09 2011 INSTALL WIND POWERED ELECTRIC GENERATOR $17,200 $168,000 Not Implemented