Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsSIC | 503 | Lumber And Construction Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0563 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,648 | $960 | n/a |
LE0563 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $307 | $140 | n/a |
LE0563 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,106 | $2,500 | n/a |
LE0563 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,800 | $19,440 | n/a |
LE0563 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,361 | $21,000 | n/a |
LE0563 # 07 Y:2024 | 07 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,253 | $9,000 | n/a |
LE0563 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $1,600 | n/a |
LE0563 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $474 | $100 | n/a |
LE0538 # 11 Y:2023 | 11 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,629 | $46,896 | Not Implemented |
LE0538 # 10 Y:2023 | 10 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $459 | $1,341 | Not Implemented |
LE0538 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,125 | $18,761 | Not Implemented |
LE0538 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,366 | $2,000 | Implemented |
LE0538 # 07 Y:2023 | 07 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $49,716 | $58,635 | Not Implemented |
LE0538 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,166 | $4,521 | Implemented |
LE0538 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,576 | $4,000 | Implemented |
LE0538 # 04 Y:2023 | 04 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,452 | $1,992 | Not Implemented |
LE0538 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $2,500 | Implemented |
LE0538 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,656 | $1,200 | Not Implemented |
LE0538 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $3,047 | $0 | Implemented |