Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsSIC | 508 | Machinery, Equipment, And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0818 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,876 | $0 | Implemented |
UD0818 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,791 | $1,460 | Not Implemented |
UD0818 # 03 Y:2010 | 03 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $103,369 | $0 | Implemented |
UD0818 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $5,865 | $0 | Implemented |
UD0818 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,405 | $0 | Not Implemented |
UD0818 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,158 | $0 | Implemented |
UD0818 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Not Implemented |
UD0818 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $16,190 | $0 | Not Implemented |
UD0818 # 09 Y:2010 | 09 | 2010 | USE OPTIMUM TEMPERATURE | $7,200 | $0 | Implemented |
UD0818 # 10 Y:2010 | 10 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,820 | $0 | Not Implemented |
UD0818 # 11 Y:2010 | 11 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $4,241 | $0 | Not Implemented |
UD0818 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Not Implemented |
UD0818 # 13 Y:2010 | 13 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,977 | $0 | Not Implemented |
UD0818 # 14 Y:2010 | 14 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $29,159 | $0 | Not Implemented |
UD0818 # 15 Y:2010 | 15 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,060 | $0 | Implemented |
UD0818 # 16 Y:2010 | 16 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,929 | $0 | Implemented |