IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0423 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,767 $1,301 Implemented
UF0423 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,442 $600 Implemented
UF0423 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $753 $0 Implemented
UF0423 # 14 Y:2009 14 2009 DEVELOP A REPAIR/REPLACE POLICY $3,460 $0 Implemented
IA0424 # 06 Y:2008 06 2008 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $801 $780 Implemented
IA0424 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $13 Implemented
IA0424 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,627 $3,004 Implemented
IA0424 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,992 $7,650 Implemented
IC0132 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $396 $0 Implemented
IC0132 # 03 Y:2007 03 2007 OPTIMIZE PLANT POWER FACTOR $8,296 $19,530 Implemented
IC0132 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $1,962 Implemented
IC0132 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $906 $0 Implemented
TT0008 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $563 $100 Implemented
TT0008 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $1,200 $300 Implemented
TT0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $110 Implemented
WV0313 # 11 Y:2005 11 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,420 $1,000 Implemented
WV0313 # 01 Y:2005 01 2005 REPAIR OR REPLACE STEAM TRAPS $94,235 $1,000 Implemented
WV0313 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $15,992 $3,200 Implemented
WV0313 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,376 $900 Implemented
WV0313 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $3,756 $1,320 Implemented
WV0313 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $2,220 $620 Implemented
WV0313 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,479 $110 Implemented
WV0313 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,952 $1,322 Implemented
OR0477 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $3,100 Implemented
OR0477 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $28,455 $11,500 Implemented