IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0008 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $563 $100 Implemented
WV0313 # 01 Y:2005 01 2005 REPAIR OR REPLACE STEAM TRAPS $94,235 $1,000 Implemented
WV0313 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,522 $10,250 Not Implemented
WV0313 # 03 Y:2005 03 2005 OPERATE BOILERS ON HIGH FIRE SETTING $27,626 $5,110 Not Implemented
WV0313 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $21,789 $110 Not Implemented
WV0313 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $15,992 $3,200 Implemented
WV0313 # 06 Y:2005 06 2005 MINIMIZE WATER USAGE $14,331 $13,600 Not Implemented
WV0313 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,376 $900 Implemented
WV0313 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,952 $1,322 Implemented
WV0313 # 09 Y:2005 09 2005 DEVELOP A REPAIR/REPLACE POLICY $3,756 $1,320 Implemented
WV0313 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,479 $110 Implemented
WV0313 # 11 Y:2005 11 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,420 $1,000 Implemented
WV0313 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $2,220 $620 Implemented
WV0313 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,101 $0 Not Implemented
WV0313 # 14 Y:2005 14 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,447 $1,050 Not Implemented
OR0477 # 01 Y:2005 01 2005 $240,000 $250,000 Not Implemented
OR0477 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $34,000 $34,000 Not Implemented
OR0477 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $28,455 $11,500 Implemented
OR0477 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $3,100 Implemented
OR0477 # 05 Y:2005 05 2005 MODIFY MATERIAL APPLICATION METHODS $14,995 $1,875 Implemented
OR0477 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $13,416 $25,000 Implemented
OR0477 # 07 Y:2005 07 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,545 $182,000 Not Implemented
OR0477 # 08 Y:2005 08 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,200 $0 Implemented
OR0477 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,870 $84,875 Not Implemented
BD0257 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $43,626 $5,040 Implemented