IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0003 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,448 $7,600 n/a
CI0003 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $16,393 $82,655 n/a
CI0003 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,546 $600 n/a
CI0003 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $87,136 $114,800 n/a
CI0003 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,557 $25 n/a
CI0003 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $8,580 n/a
CI0003 # 06 Y:2022 06 2022 USE PHOTOCELL CONTROLS $3,744 $1,166 n/a
CI0003 # 08 Y:2022 08 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,200 $500 n/a
SD0469 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $200 Implemented
SD0469 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $600 Not Implemented
SD0469 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,825 $1,500 Not Implemented
SD0469 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,769 $7,320 Not Implemented
SD0469 # 01 Y:2013 01 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,421 $53,250 Implemented
SD0469 # 02 Y:2013 02 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,156 $8,740 Not Implemented
SD0469 # 03 Y:2013 03 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,384 $50,200 Not Implemented
SD0469 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,246 $10,350 Not Implemented
SD0469 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,014 $15,500 Not Implemented
SF0399 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,958 $20,025 Not Implemented
SF0399 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,432 $962 Implemented
SF0399 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $42,675 $101,238 Not Implemented
SF0399 # 13 Y:2011 13 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,038 $65,479 Not Implemented
SF0399 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $5,862 $26,604 Implemented
SF0399 # 11 Y:2011 11 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,286 $77,335 Not Implemented
SF0399 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $835 $2,209 Not Implemented
SF0399 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,758 $307,524 Implemented