Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 5142 | Packaged Frozen Foods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0538 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $113,818 | $1,600 | Not Implemented |
OR0538 # 02 Y:2008 | 02 | 2008 | USE OPTIMUM THICKNESS INSULATION | $15,451 | $3,248 | Not Implemented |
OR0538 # 03 Y:2008 | 03 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $433,305 | $300,000 | Not Implemented |
OR0538 # 04 Y:2008 | 04 | 2008 | INSTALL SENSORS TO DETECT DEFECTS | $132,288 | $140,000 | Not Implemented |
OR0538 # 05 Y:2008 | 05 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,546 | $7,085 | Not Implemented |
OR0538 # 06 Y:2008 | 06 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,035 | $16,204 | Not Implemented |
IC0132 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $906 | $0 | Implemented |
IC0132 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,349 | $3,349 | Not Implemented |
IC0132 # 03 Y:2007 | 03 | 2007 | OPTIMIZE PLANT POWER FACTOR | $8,296 | $19,530 | Implemented |
IC0132 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,356 | $6,527 | Not Implemented |
IC0132 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71 | $147 | Not Implemented |
IC0132 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $654 | $1,962 | Implemented |
IC0132 # 07 Y:2007 | 07 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $396 | $0 | Implemented |
IC0132 # 08 Y:2007 | 08 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $860 | $0 | Not Implemented |
OR0477 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $3,100 | Implemented |
OR0477 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $240,000 | $250,000 | Not Implemented |
OR0477 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $34,000 | $34,000 | Not Implemented |
OR0477 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,455 | $11,500 | Implemented |
OR0477 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $29,545 | $182,000 | Not Implemented |
OR0477 # 05 Y:2005 | 05 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $14,995 | $1,875 | Implemented |
OR0477 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $13,416 | $25,000 | Implemented |
OR0477 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,870 | $84,875 | Not Implemented |
OR0477 # 08 Y:2005 | 08 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,200 | $0 | Implemented |