Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 518 | Beer, Wine, And Distilled Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0227 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $5,836 | $30,292 | Implemented |
DL0227 # 05 Y:2023 | 05 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $3,640 | $10,608 | Not Implemented |
DL0227 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $6,362 | $0 | Implemented |
DL0227 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $552 | Not Implemented |
DL0227 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,298 | $0 | Implemented |
DL0227 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,653 | $0 | Implemented |
CI0003 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $87,136 | $114,800 | n/a |
CI0003 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,546 | $600 | n/a |
CI0003 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,393 | $82,655 | n/a |
CI0003 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,448 | $7,600 | n/a |
CI0003 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,715 | $8,580 | n/a |
CI0003 # 06 Y:2022 | 06 | 2022 | USE PHOTOCELL CONTROLS | $3,744 | $1,166 | n/a |
CI0003 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,557 | $25 | n/a |
CI0003 # 08 Y:2022 | 08 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,200 | $500 | n/a |
BS0152 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,503 | $8,301 | Not Implemented |
BS0152 # 04 Y:2021 | 04 | 2021 | INSTALL OCCUPANCY SENSORS | $60,903 | $7,355 | Not Implemented |
BS0152 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $414 | Not Implemented |
BS0152 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,594 | $114,156 | Not Implemented |
BS0152 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $71,968 | $162,000 | Not Implemented |
MI0185 # 01 Y:2009 | 01 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,100 | $64,000 | Not Implemented |
MI0185 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $83,014 | $1,500 | Implemented |
MI0185 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,375 | $60 | Implemented |
MI0185 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,482 | $920 | Implemented |
MI0185 # 05 Y:2009 | 05 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $12,330 | $800 | Implemented |
MI0185 # 06 Y:2009 | 06 | 2009 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,182 | $640 | Implemented |