Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 65 | Real Estate |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ1002 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $1,926 | $1,660 | n/a |
MZ1002 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,984 | $3,805 | n/a |
MZ1002 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,387 | $2,260 | n/a |
MZ1002 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $96 | $310 | n/a |
IP7009 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,166 | $665 | n/a |
IP7009 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $470 | $325 | n/a |
IP7009 # 03 Y:2023 | 03 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $19,017 | $16,650 | n/a |
AS0570 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,678 | $20,940 | n/a |
AS0570 # 03 Y:2023 | 03 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,395 | $4,200 | n/a |
AS0570 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,168 | $3,380 | n/a |
AS0570 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $691 | $1,099 | n/a |
AS0570 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $425 | $200 | n/a |
AS0570 # 07 Y:2023 | 07 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $180 | $130 | n/a |
AS0570 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,353 | $72,205 | n/a |
IC0291 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $5,123 | $0 | n/a |
IC0291 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,744 | $3,353 | n/a |
IC0291 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,929 | $5,695 | n/a |
IC0291 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $78 | $157 | n/a |
IC0291 # 02 Y:2023 | 02 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,427 | $380 | n/a |
IC0290 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $745 | $2,043 | n/a |
IC0290 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,431 | $392,519 | n/a |
IC0290 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,851 | $34,225 | n/a |
IC0290 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,130 | $0 | n/a |
IC0290 # 03 Y:2023 | 03 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,981 | $19,147 | n/a |
IC0289 # 03 Y:2023 | 03 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,672 | $0 | n/a |