IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 75 Auto Repair, Services, And Parking
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0084 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $1,483 $2,500 Implemented
MZ0084 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $6,939 $0 Implemented
MZ0084 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,142 $1,000 Not Implemented
MZ0084 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,736 $11,730 Implemented
MZ0084 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,831 $37,520 Not Implemented
MZ0084 # 04 Y:2012 04 2012 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,897 $2,400 Not Implemented
MZ0084 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,987 $500 Not Implemented
MZ0084 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $3,500 Implemented
MZ0084 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $15,200 Implemented
MZ0084 # 10 Y:2012 10 2012 OPERATE BOILERS ON HIGH FIRE SETTING $10,918 $1,770 Implemented
IA0474 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,183 $11,760 Not Implemented
IA0474 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,989 $668 Not Implemented
IA0474 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,851 $5,045 Not Implemented
UA3003 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,940 $18,577 Not Implemented
UA3003 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $190 $129 Implemented
UA3003 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $120 $129 Implemented
UA3003 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $367 $1,000 Implemented
UA3003 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,872 $640 Not Implemented
UA3003 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $1,500 Implemented
UA3003 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,858 $8,376 Not Implemented
UA3003 # 08 Y:2010 08 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,679 $5,534 Not Implemented
AS0388 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $1,489 $815 Not Implemented
AS0388 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,505 $1,477 Not Implemented
AS0388 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $953 $1,400 Not Implemented
AS0388 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,196 $1,247 Not Implemented