Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri-Columbia |
---|---|
Assessment Year | 2012 |
Principal Product | tire retrading |
NAICS | 326212 - Tire Retreading |
SIC | 7534 - Tire Retreading And Repair Shops |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $72,450 | 572,605 | kWh | $0.13 |
Electricity Demand | $8,345 | 3,129 | kW-months/year | $2.67 |
Natural Gas | $192,894 | 27,756 | MMBtu | $6.95 |
TOTAL ENERGY COSTS | $273,690 | |||
RECOMMENDED SAVINGS* | $55,290 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,433 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,602 Cost: $15,200 |
$5,391 | 44,928 | $211 | 86 | - | - |
$5,391 44,928 kWh |
$211 86 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,756 Cost: $3,500 |
$3,614 | 30,264 | $142 | 58 | - | - |
$3,614 30,264 kWh |
$142 58 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,987 Cost: $500 |
$2,987 | 24,892 | - | - | - | - |
$2,987 24,892 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $1,897 Cost: $2,400 |
$1,897 | 15,810 | - | - | - | - |
$1,897 15,810 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $12,831 Cost: $37,520 |
- | - | - | - | $12,831 | 1,846 |
- - kWh |
- - kW-months/year |
$12,831 1,846 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $7,736 Cost: $11,730 |
$7,736 | 64,464 | - | - | - | - |
$7,736 64,464 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,142 Cost: $1,000 |
- | - | $1,142 | 468 | - | - |
- - kWh |
$1,142 468 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $6,939 Cost: - |
- | - | - | - | $6,939 | 998 |
- - kWh |
- - kW-months/year |
$6,939 998 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,483 Cost: $2,500 |
- | - | - | - | $1,483 | 213 |
- - kWh |
- - kW-months/year |
$1,483 213 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $10,918 Cost: $1,770 |
- | - | - | - | $10,918 | 1,571 |
- - kWh |
- - kW-months/year |
$10,918 1,571 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,290 Cost: $76,120 |
$21,624 | 180,358 | $1,495 | 612 | $32,171 | 4,629 | $21,624 180,358 kWh |
$1,495 612 kW-months/year |
$32,171 4,629 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,433 Cost: $34,700 |
$16,740 | 139,656 | $353 | 144 | $19,340 | 2,783 | $16,740 139,656 kWh |
$353 144 kW-months/year |
$19,340 2,783 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||