Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 7999 | Amusement And Recreation, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS0223 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $39 | $50 | Implemented |
LS0223 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $160 | $50 | Implemented |
LS0223 # 01 Y:2023 | 01 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $11,364 | $1,800 | Not Implemented |
WV0582 # 05 Y:2019 | 05 | 2019 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $432 | $1,900 | Implemented |
WV0582 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,656 | $56,277 | Implemented |
WV0582 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,715 | $35,838 | Implemented |
WV0582 # 03 Y:2019 | 03 | 2019 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $9,634 | $40,000 | Implemented |
WV0582 # 04 Y:2019 | 04 | 2019 | MINIMIZE WATER USAGE | $4,552 | $7,000 | Not Implemented |
WV0582 # 07 Y:2019 | 07 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $121 | $563 | Implemented |
WV0582 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $339 | $0 | Implemented |
UU0124 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $980 | $0 | Implemented |
UU0124 # 09 Y:2017 | 09 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $386 | $0 | Implemented |
UU0124 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $1,463 | Implemented |
UU0124 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $854 | $1,702 | Implemented |
UU0124 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,833 | $4,266 | Not Implemented |
UU0124 # 04 Y:2017 | 04 | 2017 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,392 | $10,800 | Not Implemented |
UU0124 # 03 Y:2017 | 03 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,630 | $3,140 | Not Implemented |
UU0124 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,444 | $5,000 | Implemented |
UU0124 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,503 | $0 | Implemented |
DL0129 # 06 Y:2014 | 06 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,345 | $5,000 | Not Implemented |
DL0129 # 07 Y:2014 | 07 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,806 | $0 | Implemented |
DL0129 # 05 Y:2014 | 05 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,700 | $3,500 | Implemented |
DL0129 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $36,400 | $7,600 | Not Implemented |
DL0129 # 03 Y:2014 | 03 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $141,000 | $181,900 | Not Implemented |
DL0129 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,400 | $54,200 | Implemented |