Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 806 Hospitals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0098 # 01 Y:2024 01 2024 REPLACE BOILER $6,690 $32,200 n/a
NL0098 # 02 Y:2024 02 2024 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $4,787 $10,040 n/a
NL0098 # 03 Y:2024 03 2024 RECOVER AND REUSE WASTE MATERIAL $820 $6,490 n/a
OK1114 # 07 Y:2024 07 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $609 $17,437 n/a
OK1114 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $0 n/a
OK1114 # 05 Y:2024 05 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $304 $278 n/a
OK1114 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,371 $9,240 n/a
OK1114 # 03 Y:2024 03 2024 OPERATE BOILERS ON HIGH FIRE SETTING $3,357 $16,000 n/a
OK1114 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $3,939 $0 n/a
OK1114 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $35,465 $327,600 n/a
MZ1004 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $227 $250 n/a
MZ1004 # 04 Y:2024 04 2024 REPLACE BOILER $15,382 $100,750 n/a
MZ1004 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,256 $21,075 n/a
MZ1004 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $971 $598 n/a
OK1110 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,945 $56,850 n/a
OK1110 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $3,264 $1,330 n/a
OK1110 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $5,873 $7,892 n/a
OK1110 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,588 $280,800 n/a
OK1110 # 05 Y:2024 05 2024 OPERATE BOILERS ON HIGH FIRE SETTING $8,594 $22,000 n/a
OK1110 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,219 $12,400 n/a
OK1110 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,681 $1,861 n/a
OK1110 # 08 Y:2024 08 2024 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $996 $160 n/a
OK1103 # 04 Y:2024 04 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,069 $8,525 Implemented
OK1103 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,355 $1,490 Implemented
OK1103 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,305 $190,944 Implemented