Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 82 | Educational Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0245 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $299 | $100 | Implemented |
UU0245 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,961 | $3,200 | Implemented |
UU0245 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,514 | $18,000 | Implemented |
UU0234 # 03 Y:2023 | 03 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $90 | $400 | Implemented |
UU0234 # 02 Y:2023 | 02 | 2023 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,263 | $1,210 | Implemented |
UU0234 # 01 Y:2023 | 01 | 2023 | ISOLATE HOT OR COLD EQUIPMENT | $6,940 | $1,552 | Implemented |
UU0232 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,942 | $26,160 | Implemented |
UU0232 # 02 Y:2023 | 02 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $5,219 | $12,000 | Implemented |
UU0232 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $909 | $425 | Implemented |
UU0233 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,358 | $31,190 | Implemented |
UU0233 # 04 Y:2023 | 04 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $425 | $255 | Implemented |
UU0228 # 06 Y:2023 | 06 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $248 | $255 | Implemented |
UU0228 # 01 Y:2023 | 01 | 2023 | OPERATE BOILERS ON HIGH FIRE SETTING | $5,182 | $15,000 | Implemented |
UU0226 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $2,090 | $2,000 | Implemented |
UU0226 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,910 | $800 | Implemented |
UU0226 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,162 | $2,000 | Implemented |
UU0174 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,383 | $85,347 | Implemented |
UU0174 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $744 | $200 | Implemented |
UU0174 # 01 Y:2021 | 01 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $24,060 | $178,852 | Implemented |
UU0165 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $660 | $660 | Implemented |
UU0165 # 04 Y:2020 | 04 | 2020 | AIR CONDITION ONLY SPACE NECESSARY | $1,220 | $1,500 | Implemented |
UU0162 # 04 Y:2020 | 04 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $328 | $1,141 | Implemented |
UU0162 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,096 | $5,759 | Implemented |
UU0162 # 01 Y:2020 | 01 | 2020 | REDUCE FLUID FLOW RATES | $8,259 | $17,871 | Implemented |
UU0130 # 01 Y:2018 | 01 | 2018 | REDUCE VENTILATION AIR | $13,209 | $0 | Implemented |