IAC logo
IAC Assessment: UU0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2024
Principal Product NA
NAICS 611210 - Junior Colleges
SIC 8222 - Junior Colleges
Sales <$500,000
# of Employees 60
Plant Area (Sq.Ft.) 151,110
Annual Production 1 Units
Production Hrs. Annual 5,840
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,484 1,364,860 kWh $0.04
Electricity Demand $72,956 4,591 kW-months/year $15.89
Natural Gas $84,401 6,974 MMBtu $12.10
TOTAL ENERGY COSTS $206,841
RECOMMENDED SAVINGS* $57,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$26,630
Cost:
$43,200
$8,964 245,670 - - - - $17,666 1,460 - - $8,964
245,670
kWh
-
-
kW-months/year
-
-
$
$17,666
1,460
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,113
Cost:
$26,430
$6,282 106,069 $1,831 115 - - - - - - $6,282
106,069
kWh
$1,831
115
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$22,211
Cost:
$18,400
- - - - - - - - $22,211 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$22,211
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$717
Cost:
$2,200
- - - - $717 - - - - - -
-
kWh
-
-
kW-months/year
$717
-
$
-
-
MMBtu
-
-
$
05: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$150
Cost:
$450
$150 4,140 - - - - - - - - $150
4,140
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$57,821
Cost:
$90,680
$15,396 355,879 $1,831 115 $717 - $17,666 1,460 $22,211 - $15,396
355,879
kWh
$1,831
115
kW-months/year
$717
-
$
$17,666
1,460
MMBtu
$22,211
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost