IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
Reset
SIC 82 Educational Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0174 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $252 $1,180 Not Implemented
TT0174 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,519 $44,081 Not Implemented
TT0174 # 07 Y:2016 07 2016 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $6,074 $26,600 Not Implemented
TT0174 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,263 $0 Implemented
TT0174 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $124 $100 Not Implemented
TT0174 # 10 Y:2016 10 2016 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $19,191 $100,721 Not Implemented
TT0174 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,807 $113,319 Not Implemented
TT0174 # 12 Y:2016 12 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,847 $0 Not Implemented
TT0110 # 01 Y:2013 01 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $362,330 $650,000 Implemented
TT0110 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,000 $60,000 Implemented
TT0110 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $11,915 $11,497 Not Implemented
AM0640 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $79,770 $0 Implemented
AM0640 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,347 $26,600 Implemented
AM0640 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $18,322 $28,020 Not Implemented
AM0640 # 04 Y:2013 04 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,124 $200,000 Implemented
AM0640 # 05 Y:2013 05 2013 REPLACE BOILER $14,187 $213,000 Implemented
AM0640 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,738 $10,800 Implemented
AM0640 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $1,040 Not Implemented
AM0640 # 08 Y:2013 08 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $6,079 $840 Implemented
AM0640 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,528 $3,600 Implemented
AM0640 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,965 $600 Implemented
AM0640 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,400 $500 Implemented
AM0640 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,085 $20 Not Implemented
AM0640 # 13 Y:2013 13 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,955 $11,248 Implemented
AM0640 # 14 Y:2013 14 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,881 $40 Not Implemented