IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

482

matching recommendations
Reset
SIC 82 Educational Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0920 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,640 $7,500 n/a
AM0920 # 04 Y:2024 04 2024 REPAIR FAULTY LOUVERS AND DAMPERS $4,125 $9,000 n/a
AM0920 # 05 Y:2024 05 2024 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,403 $1,000 n/a
UU0253 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $26,630 $43,200 n/a
UU0253 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,113 $26,430 n/a
UU0253 # 03 Y:2024 03 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,211 $18,400 n/a
UU0253 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $717 $2,200 n/a
UU0253 # 05 Y:2024 05 2024 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $150 $450 n/a
AM0919 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,964 $20,366 n/a
AM0919 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,780 $468,000 n/a
AM0919 # 03 Y:2024 03 2024 REDUCE FLUID FLOW RATES $1,498 $3,000 n/a
AM0919 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,503 $2,500 n/a
AM0919 # 05 Y:2024 05 2024 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $317 $1,000 n/a
AM0918 # 01 Y:2024 01 2024 REDUCE FLUID FLOW RATES $1,310 $3,000 n/a
AM0918 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $25,377 $489,840 n/a
AM0918 # 03 Y:2024 03 2024 REPAIR FAULTY LOUVERS AND DAMPERS $412 $3,000 n/a
AM0918 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $2,244 $1,215 n/a
AM0918 # 05 Y:2024 05 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,601 $3,000 n/a
AM0917 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $362 $3,000 n/a
AM0917 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,840 $468,000 n/a
AM0917 # 03 Y:2024 03 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $21 $300 n/a
AM0917 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $77 $1,470 n/a
CI0028 # 08 Y:2024 08 2024 REPLACE BOILER $1,659 $8,000 n/a
CI0028 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $5,321 $22,000 n/a
CI0028 # 06 Y:2024 06 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,530 $11,000 n/a