Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 82 | Educational Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ORC016 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,757 | $18,123 | n/a |
ORC016 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $14,324 | $1,894 | n/a |
ORC016 # 03 Y:2025 | 03 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $90,790 | $266,383 | n/a |
ORC016 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $7,000 | n/a |
UU0265 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $551 | n/a |
UU0265 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $545 | $572 | n/a |
UU0265 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $546 | $1,620 | n/a |
UU0265 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,000 | $5,450 | n/a |
UU0265 # 05 Y:2025 | 05 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,338 | $5,515 | n/a |
UU0265 # 04 Y:2025 | 04 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $1,620 | $14,000 | n/a |
UU0265 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,938 | $15,980 | n/a |
UU0265 # 01 Y:2025 | 01 | 2025 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,697 | $45,926 | n/a |
UU0265 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,450 | $9,720 | n/a |
UD1105 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $4,117 | $7,200 | n/a |
UD1105 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $990 | $3,800 | n/a |
UD1105 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,991 | $373,800 | n/a |
UD1105 # 03 Y:2025 | 03 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $854 | $5,000 | n/a |
UD1104 # 01 Y:2025 | 01 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,586 | $21,450 | n/a |
UD1104 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,258 | $5,000 | n/a |
UD1104 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,793 | $92,400 | n/a |
UD1103 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $11,529 | $28,000 | n/a |
UD1103 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,186 | $3,750 | n/a |
UD1103 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,580 | $273,000 | n/a |
UD1103 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $110 | n/a |
UD1103 # 05 Y:2025 | 05 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $6,351 | $81,000 | n/a |