IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 8221 Colleges And Universities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORC016 # 02 Y:2025 02 2025 REPAIR OR REPLACE STEAM TRAPS $14,324 $1,894 n/a
ORC016 # 01 Y:2025 01 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,757 $18,123 n/a
ORC016 # 03 Y:2025 03 2025 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $90,790 $266,383 n/a
ORC016 # 04 Y:2025 04 2025 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $838 $7,000 n/a
UU0265 # 02 Y:2025 02 2025 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,450 $9,720 n/a
UU0265 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $546 $1,620 n/a
UU0265 # 01 Y:2025 01 2025 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,697 $45,926 n/a
UU0265 # 08 Y:2025 08 2025 RECOVER WASTE HEAT FROM EQUIPMENT $545 $572 n/a
UU0265 # 04 Y:2025 04 2025 USE BATTERY STORAGE FOR DEMAND CONTROL $1,620 $14,000 n/a
UU0265 # 05 Y:2025 05 2025 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,338 $5,515 n/a
UU0265 # 03 Y:2025 03 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,938 $15,980 n/a
UU0265 # 09 Y:2025 09 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $551 n/a
UU0265 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,000 $5,450 n/a
MUCM20 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,363 $0 n/a
MUCM20 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $318 $349 n/a
MUCM20 # 03 Y:2024 03 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $124 $0 n/a
MUCM20 # 05 Y:2024 05 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $35 $124 n/a
MUCM20 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7 $0 n/a
MUCM20 # 06 Y:2024 06 2024 ELIMINATE/REDUCE AN OPERATION $178 $0 n/a
MUCM19 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,679 $0 n/a
MUCM19 # 03 Y:2024 03 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,555 $0 n/a
MUCM19 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $663 $0 n/a
MUCM19 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $0 n/a
MUCM19 # 06 Y:2024 06 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $49 $111 n/a
MUCM19 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,108 $1,539 n/a