Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 87 | Engineering & Management Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1522 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $872 | $4,215 | Not Implemented |
MS0395 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,342 | $210,000 | Not Implemented |
MS0395 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,723 | $18,748 | Implemented |
MS0395 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $677 | $540 | Implemented |
MS0395 # 04 Y:2022 | 04 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $2,447 | $15,480 | Not Implemented |
OR0723 # 01 Y:2019 | 01 | 2019 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $488,033 | $1,500,000 | Implemented |
OR0723 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,541 | $1,027 | Not Implemented |
OR0723 # 03 Y:2019 | 03 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $5,360 | $1,789 | Implemented |
WM0104 # 01 Y:2017 | 01 | 2017 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $64,540 | $93,226 | Not Implemented |
WM0104 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $15,927 | $33,500 | Not Implemented |
WM0104 # 03 Y:2017 | 03 | 2017 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $14,165 | $0 | Implemented |
WM0104 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,736 | $45,000 | Not Implemented |
WM0104 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,008 | $0 | Implemented |
WM0104 # 06 Y:2017 | 06 | 2017 | USE SYNTHETIC LUBRICANT | $7,607 | $650 | Not Implemented |
WM0104 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,589 | $554 | Not Implemented |
LS0001 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,268 | $0 | Not Implemented |
LS0001 # 02 Y:2017 | 02 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,143 | $420 | Implemented |
LS0001 # 03 Y:2017 | 03 | 2017 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $520 | $1,200 | Implemented |
LS0001 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $257 | $0 | Not Implemented |
LS0001 # 05 Y:2017 | 05 | 2017 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $430 | $380 | Implemented |
LS0001 # 06 Y:2017 | 06 | 2017 | INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING | $1,040 | $0 | Not Implemented |
LS0001 # 07 Y:2017 | 07 | 2017 | PAY UTILITY BILLS ON TIME | $343 | $0 | Implemented |
BD0434 # 01 Y:2013 | 01 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $48,621 | $13,862 | Implemented |
BD0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,169 | $11,159 | Implemented |
BD0434 # 03 Y:2013 | 03 | 2013 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $15,503 | $11,000 | Not Implemented |