IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 873 Research And Testing Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM06 # 02 Y:2022 02 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,378 $0 Implemented
MUCM06 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $934 Implemented
MUCM06 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,458 $12,451 Not Implemented
MUCM06 # 05 Y:2022 05 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $981 $900 Not Implemented
MUCM06 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $281 $0 Implemented
MUCM06 # 07 Y:2022 07 2022 OPERATE BOILERS ON HIGH FIRE SETTING $1,703 $450 Not Implemented
MUCM06 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,882 $7,450 Not Implemented
MUCM06 # 09 Y:2022 09 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,603 $58,440 Not Implemented
MUCM06 # 10 Y:2022 10 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $537 $2,500 Not Implemented
MUCM06 # 11 Y:2022 11 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,435 $11,466 Not Implemented
MUCM06 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $419 $742 Implemented
UM0423 # 03 Y:2013 03 2013 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,300 $6,500 Not Implemented
UM0423 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,224 $5,550 Implemented
UM0423 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $454 $175 Implemented
UM0393 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,581 $2,500 Implemented
UM0393 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $7,039 $6,006 Not Implemented
UM0393 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,888 $5,440 Implemented
UM0393 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,578 $200 Not Implemented
UM0393 # 08 Y:2011 08 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,408 $1,533 Implemented
UM0393 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $1,916 $1,200 Implemented
UM0393 # 10 Y:2011 10 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,545 $23,900 Not Implemented
UM0393 # 11 Y:2011 11 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,143 $2,500 Not Implemented
UM0393 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $12,938 $600 Implemented
UM0393 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $29,225 Implemented
UM0393 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,190 $18,432 Not Implemented