IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 899 Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1099 # 04 Y:2023 04 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $160 $510 n/a
OK1099 # 03 Y:2023 03 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $577 $416 n/a
OK1099 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $865 $0 n/a
OK1099 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,723 $5,897 n/a
OK1098 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75 $100 n/a
OK1098 # 02 Y:2023 02 2023 REPLACE BOILER $2,974 $78,000 n/a
OK1098 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $2,834 n/a
MU0017 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $106 $240 Not Implemented
MU0017 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $719 $75 Implemented
MU0017 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $555 Implemented
MU0017 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31 $0 Not Implemented
MU0017 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,860 $0 Implemented
AS0524 # 01 Y:2022 01 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,648 $8,445 Implemented
AS0524 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $151 $149 Implemented
AS0524 # 06 Y:2022 06 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $193 $54 Implemented
AS0524 # 05 Y:2022 05 2022 SHADE WINDOWS FROM SUMMER SUN $1,064 $5,010 Implemented
AS0524 # 04 Y:2022 04 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,682 $742 Implemented
AS0524 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,785 $200 Implemented
AS0524 # 02 Y:2022 02 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,878 $2,400 Implemented
IP0054 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $1,348 Not Implemented
IP0054 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $20,367 $2,184 Not Implemented
IP0054 # 02 Y:2015 02 2015 PAY BILLS ON TIME TO AVOID LATE FEES $576 $0 Implemented
IP0054 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $329 $0 Not Implemented