IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,291

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0148 # 13 Y:2019 13 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,087 $0 Not Implemented
WM0148 # 14 Y:2019 14 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $805 $1,664 Implemented
WM0148 # 15 Y:2019 15 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $741 $970 Not Implemented
WM0148 # 16 Y:2019 16 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $617 $1,175 Not Implemented
WM0147 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,169 $92,680 Not Implemented
WM0147 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,023 $49,220 Not Implemented
WM0147 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,143 $8,425 Not Implemented
WM0147 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,150 $2,000 Not Implemented
WM0147 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,217 $7,000 Not Implemented
WM0147 # 06 Y:2019 06 2019 REDUCE HEAT GAIN BY WINDOW TINTING $1,426 $4,100 Not Implemented
WM0147 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,094 $2,750 Not Implemented
MA0810 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,872 $17,950 Implemented
MA0810 # 02 Y:2019 02 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,788 $8,400 Implemented
MA0810 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,797 $625 Not Implemented
MA0810 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,310 $51,675 Not Implemented
MA0810 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,171 $2,500 Not Implemented
MA0810 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $934 $2,484 Implemented
IC0225 # 01 Y:2019 01 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $44,444 $23,100 Implemented
IC0225 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,274 $4,150 Implemented
IC0225 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,600 $105 Not Implemented
IC0225 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,947 $3,110 Implemented
IC0225 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,711 $3,850 Not Implemented
IC0225 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $2,596 $652 Implemented
IC0225 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $10,365 $18,280 Not Implemented
LE0485 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,517 $120 Not Implemented