Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142,596
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0173 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,485 | $0 | Not Implemented |
IP0173 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,055 | $0 | Not Implemented |
IP0173 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,365 | $840 | Not Implemented |
IP0173 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,684 | $61,320 | Not Implemented |
IP0173 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $399 | $1,042 | Not Implemented |
IP0173 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,837 | $33,000 | Not Implemented |
ORC009 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $654 | $2,000 | Not Implemented |
ORC009 # 02 Y:2023 | 02 | 2023 | REPLACE BOILER | $1,624 | $10,000 | Not Implemented |
ORC009 # 03 Y:2023 | 03 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $178 | $500 | Not Implemented |
ORC009 # 04 Y:2023 | 04 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $83 | $400 | Not Implemented |
ORC009 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $307 | $200 | Not Implemented |
NT0007 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,184 | $5,993 | Implemented |
NT0007 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $63,856 | $337,512 | Not Implemented |
NT0007 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,290 | $5,486 | Not Implemented |
OK1090 # 02 Y:2023 | 02 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $172 | $530 | Implemented |
OK1090 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,602 | $1,797 | Implemented |
OK1090 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,316 | $3,638 | Implemented |
OK1090 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $68,844 | $438,000 | Not Implemented |
CI0015 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $88,567 | $1,500 | Not Implemented |
CI0015 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $36,511 | $165,000 | Implemented |
CI0015 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,757 | $0 | Not Implemented |
CI0015 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $3,770 | $9,000 | Not Implemented |
CI0015 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,958 | $3,500 | Not Implemented |
CI0015 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,444 | $2,700 | Not Implemented |
CI0015 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,292 | $5,000 | Not Implemented |