IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,619

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0526 # 07 Y:2022 07 2022 INSTALL SET-BACK TIMERS $423 $627 Not Implemented
SU0526 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $158,273 $259,521 Not Implemented
SU0526 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,454 $16,991 Not Implemented
SU0526 # 10 Y:2022 10 2022 RECOVER WASTE HEAT FROM EQUIPMENT $98 $369 Not Implemented
AM0866 # 01 Y:2023 01 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $16,120 $700 Not Implemented
AM0866 # 02 Y:2023 02 2023 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,607 $4,020 Implemented
AM0866 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,015 $16,615 Not Implemented
AM0866 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $780 $0 Implemented
AM0866 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $630 $3,605 Implemented
AM0866 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $2,441 Implemented
AM0866 # 07 Y:2023 07 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $36 $18 Implemented
AM0872 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,338 $181,299 n/a
AM0872 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $28,728 $530,400 n/a
AM0872 # 03 Y:2023 03 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,378 $17,850 n/a
AM0872 # 04 Y:2023 04 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,844 $5,000 n/a
UF0586 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $86,172 $297,040 Not Implemented
UF0586 # 02 Y:2022 02 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,066 $12,420 Implemented
UF0586 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,260 $6,608 Not Implemented
UF0586 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,260 $25,400 Implemented
UF0586 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $9,876 Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented
UD1049 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $153,776 $45,000 Not Implemented
UD1049 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72,916 $709 Not Implemented
UD1049 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,075 $952 Not Implemented