IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,738

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0153 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $73 $128 Not Implemented
IP0153 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,112 $6,705 Not Implemented
IC0253 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,199 $9,023 Not Implemented
IC0253 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $43,447 $8,510 Not Implemented
IC0253 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50 $0 Not Implemented
IC0253 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $39,245 $13,624 Not Implemented
IC0253 # 05 Y:2022 05 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $21,572 $7,624 Not Implemented
UU0195 # 01 Y:2022 01 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,680 $22,600 Not Implemented
UU0195 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,177 $25,216 Not Implemented
UU0195 # 03 Y:2022 03 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,645 $2,000 Not Implemented
UU0195 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,698 $20,000 Not Implemented
UU0195 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $3,620 $7,340 Not Implemented
UU0195 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,050 $218 Not Implemented
UU0195 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,910 $3,500 Not Implemented
UU0195 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $3,908 Not Implemented
UU0195 # 09 Y:2022 09 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $883 $1,000 Not Implemented
LS2205 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,208 $100 Implemented
LS2205 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $483 $50 Implemented
LS2205 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $778 $135 Implemented
LS2205 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,916 $3,142 Implemented
LS2205 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $84 $50 Not Implemented
LS2205 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $586 $2,200 Not Implemented
TT0265 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $12,477 $2,065 Not Implemented
TT0265 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,704 $9,000 Not Implemented
TT0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $3,967 Implemented