IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,614

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0010 # 02 Y:1991 02 1991 OPTIMIZE PLANT POWER FACTOR $25,245 $39,150 Implemented
ND0010 # 03 Y:1991 03 1991 SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL $573 $0 Implemented
ND0011 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $41,503 $2,000 Implemented
ND0011 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,123 $9,103 Implemented
ND0011 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $11,735 $35,163 Implemented
ND0011 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,996 $0 Implemented
ND0011 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,544 $700 Implemented
ND0011 # 08 Y:1991 08 1991 REPAIR OR REPLACE STEAM TRAPS $146 $250 Implemented
ND0012 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,398 $400 Not Implemented
ND0012 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $468 Not Implemented
ND0012 # 03 Y:1991 03 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $280 $250 Not Implemented
ND0012 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $0 Not Implemented
OK0360 # 01 Y:1991 01 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,269 $135 Implemented
OK0360 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,965 $0 Implemented
OK0360 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $1,000 Implemented
OR0125 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $18,739 $0 Implemented
OR0125 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,392 $6,072 Implemented
OR0125 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,391 $35,042 Implemented
OR0125 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $0 Implemented
OR0125 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,934 $83,040 Implemented
OR0132 # 01 Y:1991 01 1991 INSTALL SET-BACK TIMERS $736 $0 Implemented
OR0132 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $317 $0 Not Implemented
OR0132 # 03 Y:1991 03 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,074 $500 Implemented
OR0132 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,538 $1,000 Implemented
OR0132 # 06 Y:1991 06 1991 HEAT WATER WITH EXHAUST HEAT $6,513 $5,744 Implemented