IAC logo
IAC Assessment: UF0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1993
Principal Product Scientific lasers
NAICS n/a
SIC 3845 - Electromedical Equipment
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 44,000
Annual Production 300 Pieces
Production Hrs. Annual 7,865
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,089 1,002,638 kWh $0.06
TOTAL ENERGY COSTS $60,089
RECOMMENDED SAVINGS* $18,077 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,909
Cost:
$1,164
$2,909 48,359 $2,909
48,359
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,283
Cost:
$5,896
$1,283 21,395 $1,283
21,395
kWh
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$9,216
Cost:
$33,045
$9,216 137,456 $9,216
137,456
kWh
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$768
Cost:
-
$768 12,896 $768
12,896
kWh
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$192
Cost:
$128
$192 3,224 $192
3,224
kWh
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$53
Cost:
$293
$53 879 $53
879
kWh
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,656
Cost:
$4,000
$3,656 60,961 $3,656
60,961
kWh
TOTAL RECOMMENDED Savings:
$18,077
Cost:
$44,526
$18,077 285,170 $18,077
285,170
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage