IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,581

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0203 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,651 $32,018 Implemented
MA0203 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $642 $161 Implemented
MA0204 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,629 $0 Not Implemented
MA0204 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $12,296 $3,400 Not Implemented
MA0204 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,632 $46,085 Not Implemented
MA0204 # 04 Y:1991 04 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,064 $11,160 Not Implemented
MA0204 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,027 $31,600 Not Implemented
MA0204 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $48 Not Implemented
AS0019 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,610 $0 Implemented
AS0019 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95 $155 Implemented
AS0019 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $140 $150 Implemented
AS0019 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $402 $200 Implemented
AS0019 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $390 $1,560 Implemented
AS0019 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $696 $500 Implemented
AS0019 # 07 Y:1991 07 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $1,100 Implemented
AM0110 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $1,260 $5,180 Not Implemented
AM0110 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $750 Not Implemented
AM0110 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $105 Not Implemented
AM0110 # 04 Y:1991 04 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $315 $52 Not Implemented
AM0110 # 05 Y:1991 05 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $240 $100 Not Implemented
AM0110 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $200 $160 Not Implemented
AM0110 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $85 $0 Not Implemented
AM0111 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,760 $0 Implemented
AM0111 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $6,300 $7,100 Implemented
AM0111 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $3,530 $5,700 Implemented