IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,581

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0111 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,130 $5,540 Implemented
AM0111 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $1,820 $4,800 Implemented
AM0111 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $34 Implemented
AM0112 # 01 Y:1991 01 1991 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,470 $5,000 Not Implemented
AM0112 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,670 $19,000 Not Implemented
AM0112 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $3,900 $365 Not Implemented
AM0112 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $310 Not Implemented
AM0112 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $195 $235 Not Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
MO0017 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,734 $5,100 Not Implemented
MO0017 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,087 Not Implemented
MO0017 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $570 Not Implemented
MO0017 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,117 $220 Not Implemented
MO0017 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $1,195 Not Implemented
MO0017 # 08 Y:1991 08 1991 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $586 $40 Not Implemented
MO0018 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,073 $542 Implemented
MO0018 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,564 $1,000 Implemented
MO0018 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $757 Implemented
MO0018 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $315 Implemented
MO0018 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $469 $700 Implemented
UD0334 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,567 $0 Implemented