Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,581
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0333 # 03 Y:1991 | 03 | 1991 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,653 | $1,800 | Implemented |
OK0333 # 04 Y:1991 | 04 | 1991 | USE OPTIMUM THICKNESS INSULATION | $4,914 | $9,600 | Implemented |
OK0333 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $328 | $0 | Implemented |
OK0333 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $117 | $65 | Implemented |
OK0333 # 07 Y:1991 | 07 | 1991 | INSULATE FEEDWATER TANK | $41 | $66 | Implemented |
OK0333 # 08 Y:1991 | 08 | 1991 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $197 | $410 | Implemented |
OK0333 # 09 Y:1991 | 09 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $574 | $1,050 | Implemented |
MO0016 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $164 | $45 | Implemented |
MO0016 # 02 Y:1991 | 02 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $440 | $1,095 | Implemented |
MO0016 # 03 Y:1991 | 03 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $383 | $1,145 | Implemented |
MO0016 # 04 Y:1991 | 04 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $138 | $150 | Implemented |
MO0016 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $41 | $0 | Implemented |
MO0016 # 06 Y:1991 | 06 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $18 | $3 | Implemented |
MO0016 # 07 Y:1991 | 07 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $10 | $210 | Implemented |
MA0201 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 03 Y:1991 | 03 | 1991 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $159,131 | $425,925 | Not Implemented |
MA0201 # 04 Y:1991 | 04 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,784 | $500 | Not Implemented |
MA0202 # 01 Y:1991 | 01 | 1991 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $458 | $1,012 | Implemented |
MA0202 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,469 | $2,800 | Implemented |
MA0202 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $196 | $0 | Implemented |
MA0202 # 04 Y:1991 | 04 | 1991 | REDUCE HEAT GAIN BY WINDOW TINTING | $9,467 | $37,380 | Implemented |
AM0106 # 01 Y:1991 | 01 | 1991 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $6,600 | $24,750 | Not Implemented |
AM0106 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $221 | $144 | Not Implemented |
AM0106 # 03 Y:1991 | 03 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $500 | Not Implemented |