IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,452

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0318 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $300 Implemented
UD0318 # 04 Y:1990 04 1990 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,599 $0 Implemented
UD0318 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $10,040 $5,000 Not Implemented
UD0318 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,103 $1,680 Implemented
UD0318 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,116 $5,820 Not Implemented
UD0319 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,147 $0 Implemented
UD0319 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,320 $0 Implemented
UD0319 # 03 Y:1990 03 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $13,053 $0 Implemented
UD0319 # 04 Y:1990 04 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,790 $0 Implemented
UD0320 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,650 $0 Not Implemented
UD0320 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $1,090 $0 Not Implemented
UD0320 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,389 $4,000 Not Implemented
UD0320 # 04 Y:1990 04 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,361 $3,000 Not Implemented
OR0085 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,965 $2,806 Implemented
OR0085 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $389 $240 Not Implemented
OR0085 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $483 $909 Implemented
OR0085 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $747 $1,385 Not Implemented
OR0085 # 06 Y:1990 06 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,647 $7,200 Not Implemented
OR0086 # 01 Y:1990 01 1990 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,964 $2,000 Not Implemented
OR0086 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $835 $1,381 Not Implemented
OR0086 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $3,000 Not Implemented
OR0086 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $194 $330 Not Implemented
OR0086 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,758 $3,599 Not Implemented
RU0092 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $34 Implemented
RU0092 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $500 Implemented