IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,949

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0769 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
SU0473 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,790 $0 Implemented
SU0473 # 02 Y:2019 02 2019 USE SYNTHETIC LUBRICANT $11,804 $0 Not Implemented
SU0473 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $519 $200 Implemented
SU0473 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $916 $470 Not Implemented
SU0473 # 05 Y:2019 05 2019 REDUCE VENTILATION AIR $660 $925 Not Implemented
SU0473 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $192 $290 Implemented
SU0473 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,625 $4,006 Not Implemented
SU0473 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $167 $412 Not Implemented
SU0473 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,728 $30,695 Not Implemented
WV0570 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $122,928 $148,200 Not Implemented
WV0570 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,683 $2,990 Implemented
WV0570 # 03 Y:2019 03 2019 DEVELOP A REPAIR/REPLACE POLICY $15,386 $868 Implemented
WV0570 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,976 $468 Implemented
WV0570 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $7,457 $30,875 Not Implemented
WV0570 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,692 $1,000 Implemented
WV0570 # 07 Y:2019 07 2019 INSULATE BARE EQUIPMENT $1,056 $247 Implemented
BS0117 # 01 Y:2019 01 2019 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $32,085 $5,600 Not Implemented
BS0117 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $413 $1,047 Not Implemented
BS0117 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $350 Not Implemented
BS0117 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,573 $1,650 Not Implemented
BS0117 # 05 Y:2019 05 2019 ISOLATE HOT OR COLD EQUIPMENT $3,322 $502 Not Implemented
GT0920 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,551 $629 Implemented
GT0920 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $5,826 $1,645 Implemented
GT0920 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $360 $386 Implemented