IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,147

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0063 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $106 $205 Implemented
OK0063 # 04 Y:1982 04 1982 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $972 $0 Not Implemented
OK0063 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,330 $0 Not Implemented
OK0063 # 06 Y:1982 06 1982 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $140 $0 Not Implemented
TN0146 # 01 Y:1982 01 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $32,767 $35,000 Not Implemented
TN0146 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,172 $2,000 Not Implemented
TN0146 # 03 Y:1982 03 1982 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,986 $15,000 Not Implemented
TN0146 # 04 Y:1982 04 1982 REPAIR AND ELIMINATE STEAM LEAKS $1,549 $100 Not Implemented
TN0146 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $2,130 $5,000 Not Implemented
TN0146 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,392 $15,000 Not Implemented
TN0154 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $25 Not Implemented
TN0154 # 02 Y:1982 02 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,418 $3,500 Not Implemented
TN0154 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $642 $2,100 Not Implemented
TN0154 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $0 Not Implemented
TN0159 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $3,652 $578 Not Implemented
TN0159 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,463 $100 Not Implemented
TN0159 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $1,257 $0 Not Implemented
TN0160 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,925 $625 Not Implemented
TN0160 # 02 Y:1982 02 1982 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,734 $2,210 Not Implemented
TN0160 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $1,590 $150 Not Implemented
TN0161 # 01 Y:1982 01 1982 REPLACE BOILER $13,594 $80,000 Not Implemented
TN0161 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $19,730 $20,000 Not Implemented
TN0161 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $0 Not Implemented
TN0161 # 04 Y:1982 04 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $774 $2,490 Not Implemented
OK0056 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $103 $0 Not Implemented