Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,348

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0136 # 05 Y:1989 05 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,595 $3,602 Not Implemented
MA0142 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,859 $570 Implemented
MA0142 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $39,982 $5,700 Not Implemented
MA0142 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $42,075 $45,870 Not Implemented
MA0142 # 04 Y:1989 04 1989 INSTALL SET-BACK TIMERS $6,809 $900 Not Implemented
MA0142 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $43,200 $381,000 Not Implemented
MA0142 # 06 Y:1989 06 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $27,100 $13,000 Implemented
MA0142 # 07 Y:1989 07 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $52,700 $680 Implemented
UD0280 # 01 Y:1989 01 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,040 $14,400 Implemented
UD0280 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,566 $7,000 Implemented
UD0280 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,696 $0 Implemented
UD0280 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,314 $0 Implemented
UD0280 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $0 Implemented
UD0280 # 06 Y:1989 06 1989 INSTALL STORM WINDOWS AND DOORS $955 $1,920 Implemented
UD0281 # 01 Y:1989 01 1989 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,368 $0 Implemented
UD0281 # 02 Y:1989 02 1989 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,430 $0 Not Implemented
UD0281 # 03 Y:1989 03 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,189 $1,500 Implemented
UD0281 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,628 $1,350 Implemented
UD0281 # 05 Y:1989 05 1989 INSTALL STORM WINDOWS AND DOORS $13,466 $14,758 Implemented
UD0282 # 01 Y:1989 01 1989 OPTIMIZE PLANT POWER FACTOR $9,760 $10,000 Not Implemented
UD0282 # 02 Y:1989 02 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,009 $500 Not Implemented
UD0282 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,389 $0 Not Implemented
UD0282 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $950 $1,500 Not Implemented
UD0282 # 05 Y:1989 05 1989 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,435 $1,500 Not Implemented
UD0282 # 06 Y:1989 06 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,355 $1,350 Not Implemented