IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,246

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0056 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $84 Implemented
KU0190 # 01 Y:1986 01 1986 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,383 $50 Implemented
KU0190 # 02 Y:1986 02 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $215 $0 Implemented
KU0190 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $1,510 Implemented
KU0190 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $658 $120 Implemented
KU0190 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $673 $10 Implemented
KU0190 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $249 $50 Implemented
KU0190 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $207 $0 Implemented
KU0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $2,592 Implemented
KU0191 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $423 $100 Implemented
KU0191 # 04 Y:1986 04 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $221 $0 Implemented
KU0191 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $525 $0 Implemented
LT0051 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,015 $0 Implemented
LT0051 # 02 Y:1986 02 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $1,452 $0 Implemented
LT0051 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $848 $140 Implemented
LT0051 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $1,025 $113 Implemented
LT0051 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,034 $422 Implemented
LT0051 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $0 Implemented
AT0035 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $385 $318 Implemented
AT0035 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $326 $0 Implemented
AT0035 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $1,674 $200 Implemented
AT0036 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,695 $1,492 Implemented
AT0036 # 02 Y:1986 02 1986 IMPROVE LUBRICATION PRACTICES $22,148 $0 Implemented
AT0036 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $12,746 $25,000 Implemented
CO0056 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $200 Implemented