Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,595
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0463 # 05 Y:2025 | 05 | 2025 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $13,397 | $26,570 | n/a |
MI0463 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,085 | $1,600 | n/a |
MI0463 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,871 | $0 | n/a |
MI0463 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,549 | $0 | n/a |
MI0463 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,194 | $0 | n/a |
MI0461 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,684 | $2,240 | n/a |
MI0461 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,724 | $1,840 | n/a |
MI0461 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,685 | $0 | n/a |
MI0461 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,646 | $33,112 | n/a |
MI0461 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,156 | $0 | n/a |
UD1118 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,142 | $0 | n/a |
TT0337 # 04 Y:2025 | 04 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $210 | $500 | n/a |
TT0337 # 08 Y:2025 | 08 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $108,000 | $12,300 | n/a |
UD1118 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $186 | $153 | n/a |
TT0337 # 01 Y:2025 | 01 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,309 | $1,884 | n/a |
TT0337 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,154 | $1,570 | n/a |
TT0337 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,714 | $5,000 | n/a |
UD1118 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $894 | $0 | n/a |
UD1118 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,394 | $1,740 | n/a |
TT0337 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $2,372 | $1,000 | n/a |
TT0337 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,274 | $12,000 | n/a |
UD1118 # 02 Y:2025 | 02 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,958 | $0 | n/a |
UD1118 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $2,030 | n/a |
TT0337 # 02 Y:2025 | 02 | 2025 | CONVERT TO OXYFUEL BURNERS | $37,798 | $25,000 | n/a |
TT0337 # 07 Y:2025 | 07 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,382 | $16,500 | n/a |