IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,150

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0576 # 11 Y:2024 11 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $309,796 $3,462,200 Implemented
MI0448 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,947 $700 Implemented
MI0448 # 02 Y:2024 02 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $7,135 $200 Implemented
MI0448 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,793 $0 Implemented
MI0448 # 04 Y:2024 04 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,229 $3,301 Not Implemented
MI0448 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,923 $4,108 Implemented
MI0448 # 06 Y:2024 06 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,321 $911 Implemented
MU0052 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,133 $0 Not Implemented
MU0052 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $337 $17 Not Implemented
MU0052 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $508 $1,752 Not Implemented
MU0052 # 04 Y:2024 04 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $150 $400 Not Implemented
MU0052 # 05 Y:2024 05 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,186 $0 Not Implemented
MU0052 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $84 $225 Not Implemented
MU0052 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,376 $10,087 Not Implemented
MU0052 # 08 Y:2024 08 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,663 $5,697 Not Implemented
MS0430 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $159,708 $984,550 n/a
MS0430 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $41,187 $175,000 n/a
MS0430 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $80 $1,259 n/a
MS0430 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,494 $0 n/a
MUWT05 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,094 $9,376 Not Implemented
MUWT05 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,300 $2,373 Not Implemented
MUWT05 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $178 $0 Implemented
MUWT05 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68 $20 Implemented
MUWT05 # 05 Y:2024 05 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $766 $2,052 Not Implemented
MUWT05 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $124 $49 Not Implemented