Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,595
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0336 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $153 | $255 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $551 | $375 | n/a |
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 01 Y:2025 | 01 | 2025 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $21,145 | $30,000 | n/a |
TT0336 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $60 | n/a |
TT0336 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,078 | $400 | n/a |
TT0336 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $355 | $1,600 | n/a |
TT0336 # 10 Y:2025 | 10 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $507 | $100 | n/a |
TT0336 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,201 | $5,250 | n/a |
TT0336 # 06 Y:2025 | 06 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,830 | $500 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
MU0072 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $38 | $271 | n/a |
MU0072 # 05 Y:2025 | 05 | 2025 | USE PHOTOCELL CONTROLS | $138 | $404 | n/a |
MU0072 # 07 Y:2025 | 07 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $231 | $0 | n/a |
MU0072 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $1,481 | $960 | n/a |
MU0072 # 06 Y:2025 | 06 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $228 | $0 | n/a |
MU0072 # 01 Y:2025 | 01 | 2025 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $161,393 | $126,876 | n/a |
MU0072 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,343 | $9,811 | n/a |
LS1025 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $4,942 | $1,500 | n/a |
LS1025 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,081 | $30,000 | n/a |
LS1025 # 04 Y:2025 | 04 | 2025 | USE PHOTOCELL CONTROLS | $526 | $1,391 | n/a |
LS1025 # 03 Y:2025 | 03 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,280 | $17,000 | n/a |
LS1025 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,516 | $7,522 | n/a |
MS0450 # 01 Y:2025 | 01 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $16,450 | $19,723 | n/a |