IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,393

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
RU0073 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,457 $450 Not Implemented
RU0073 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,131 $325 Implemented
RU0073 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $2,028 Implemented
RU0073 # 04 Y:1989 04 1989 AIR CONDITION ONLY SPACE NECESSARY $846 $0 Not Implemented
RU0073 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $645 Implemented
RU0073 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $0 Implemented
RU0073 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $3,530 $44,000 Not Implemented
KU0295 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $576 Implemented
KU0295 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,793 $3,300 Implemented
KU0295 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,741 $5,300 Implemented
KU0295 # 04 Y:1989 04 1989 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,301 $150 Implemented
KU0295 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,066 $0 Implemented
KU0295 # 06 Y:1989 06 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $238 $200 Not Implemented
KU0295 # 07 Y:1989 07 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $120 $200 Not Implemented
KU0295 # 08 Y:1989 08 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,182 $500 Implemented
KU0296 # 01 Y:1989 01 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,891 $15,450 Implemented
KU0296 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,025 $1,690 Implemented
KU0296 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $620 $0 Implemented
KU0296 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,973 $5,262 Implemented
MA0162 # 01 Y:1989 01 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $936 $75 Implemented
MA0162 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $665 $50 Not Implemented
MA0162 # 03 Y:1989 03 1989 INSTALL EFFICIENT RECTIFIERS $14,209 $8,500 Not Implemented