IAC Assessment: GT0399
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product PATOTO AND CORN CHIPS
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 290
Plant Area (Sq.Ft.) 0
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $539,230 11,854,924 kWh $0.05
Natural Gas $442,515 167,371 MMBtu $2.64
TOTAL ENERGY COSTS $981,745
RECOMMENDED SAVINGS* $13,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,063
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$615
Cost:
$285
- - $615 233 -
-
kWh
$615
233
MMBtu
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$910
Cost:
$300
- - $910 344 -
-
kWh
$910
344
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$840
Cost:
$3,000
- - $840 318 -
-
kWh
$840
318
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,190
Cost:
$3,930
$3,190 70,047 - - $3,190
70,047
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$925
Cost:
$5,000
$925 20,223 - - $925
20,223
kWh
-
-
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,950
Cost:
$50
- - $1,950 739 -
-
kWh
$1,950
739
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$431
Cost:
$229
$431 9,379 - - $431
9,379
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,088
Cost:
$45,000
$5,088 111,958 - - $5,088
111,958
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,949
Cost:
$57,794
$9,634 211,607 $4,315 1,634 $9,634
211,607
kWh
$4,315
1,634
MMBtu
TOTAL IMPLEMENTED Savings:
$12,063
Cost:
$54,280
$9,203 202,228 $2,860 1,083 $9,203
202,228
kWh
$2,860
1,083
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas