IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,570

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0022 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,480 $1,246 Implemented
ST0022 # 10 Y:1985 10 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,680 $5,600 Not Implemented
ST0023 # 01 Y:1985 01 1985 AIR CONDITION ONLY SPACE NECESSARY $1,091 $125 Implemented
ST0023 # 02 Y:1985 02 1985 INSTALL AUTOMATIC STACK DAMPER $8,365 $26,400 Not Implemented
ST0023 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,753 $0 Implemented
ST0023 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,538 $6,448 Implemented
ST0023 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,180 $96 Implemented
ST0023 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $266 $182 Not Implemented
ST0023 # 08 Y:1985 08 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,472 $0 Implemented
ST0023 # 09 Y:1985 09 1985 RECOVER WASTE HEAT FROM EQUIPMENT $738 $2,000 Implemented
ST0023 # 10 Y:1985 10 1985 USE COMPRESSOR AIR FILTERS $479 $120 Implemented
ST0024 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Implemented
ST0024 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65 $95 Not Implemented
ST0024 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,844 $1,600 Not Implemented
ST0024 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $893 $112 Implemented
GT0252 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,225 $500 Implemented
GT0252 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,800 $41,660 Not Implemented
GT0252 # 03 Y:1985 03 1985 KEEP BOILER TUBES CLEAN $3,730 $5,000 Implemented
GT0252 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,283 $2,928 Implemented
GT0252 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,220 $4,800 Implemented
GT0252 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,490 $0 Implemented
GT0252 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $12,650 $10,000 Not Implemented
GT0254 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $944 $617 Implemented
GT0254 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $230 Implemented
GT0254 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,500 $75,000 Implemented