IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,570

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0025 # 11 Y:1985 11 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $32,119 $10,000 Not Implemented
AT0004 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $146 $311 Implemented
AT0004 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,630 $2,500 Implemented
AT0004 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,373 $0 Implemented
AT0004 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,342 $300 Implemented
AT0003 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $189 $81 Implemented
AT0003 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $163 $0 Not Implemented
AT0003 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,417 $5,790 Not Implemented
KU0157 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,738 $2,752 Not Implemented
KU0157 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $1,569 $290 Implemented
KU0157 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $4,000 Implemented
KU0157 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,550 Implemented
KU0157 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $759 $1,016 Implemented
KU0157 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $1,500 Implemented
KU0157 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $899 $1,480 Implemented
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
UD0157 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,237 $250 Implemented
UD0157 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,875 $1,994 Implemented
UD0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,260 Implemented
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 03 Y:1985 03 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,850 $18,000 Not Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented
UD0160 # 01 Y:1985 01 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $26,076 $20,000 Implemented
UD0160 # 02 Y:1985 02 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,657 $2,000 Implemented