Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,098
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0147 # 01 Y:1993 | 01 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,977 | $2,160 | Implemented |
ND0147 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $97 | $144 | Not Implemented |
ND0147 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,829 | $300 | Implemented |
ND0147 # 02 Y:1993 | 02 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,264 | $2,085 | Not Implemented |
UD0395 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,516 | $1,200 | Implemented |
UD0395 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,656 | $10,000 | Not Implemented |
UD0395 # 01 Y:1993 | 01 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,009 | $2,080 | Implemented |
UD0395 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,997 | $48,174 | Not Implemented |
UD0395 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,051 | $8,096 | Implemented |
UD0395 # 03 Y:1993 | 03 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,731 | $0 | Implemented |
UD0395 # 07 Y:1993 | 07 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,563 | $10,625 | Implemented |
WI0195 # 07 Y:1993 | 07 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $671 | $0 | Implemented |
WI0195 # 03 Y:1993 | 03 | 1993 | INSTALL OCCUPANCY SENSORS | $247 | $150 | Not Implemented |
WI0195 # 08 Y:1993 | 08 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $384 | $588 | Not Implemented |
WI0195 # 01 Y:1993 | 01 | 1993 | OPTIMIZE PLANT POWER FACTOR | $21,307 | $17,400 | Implemented |
WI0195 # 06 Y:1993 | 06 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $206 | $350 | Not Implemented |
WI0195 # 09 Y:1993 | 09 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $132 | $0 | Not Implemented |
WI0195 # 10 Y:1993 | 10 | 1993 | INSULATE BARE EQUIPMENT | $187 | $660 | Not Implemented |
WI0195 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,291 | $3,946 | Not Implemented |
WI0195 # 04 Y:1993 | 04 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,037 | $1,050 | Not Implemented |
WI0195 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $859 | $0 | Not Implemented |
SD0070 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,910 | $3,450 | Implemented |
GT0515 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,090 | $0 | Not Implemented |
GT0515 # 01 Y:1993 | 01 | 1993 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,130 | $9,570 | Not Implemented |
SD0070 # 02 Y:1993 | 02 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,339 | $8,744 | Implemented |