IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,983

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0080 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,145 $300 Implemented
CO0080 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,565 $500 Implemented
MA0080 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $44,537 $600 Implemented
MA0080 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,100 $3,000 Implemented
MA0079 # 05 Y:1986 05 1986 USE OPTIMUM THICKNESS INSULATION $21,098 $5,000 Implemented
MA0079 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,519 $13,000 Not Implemented
MA0079 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,763 $4,700 Implemented
MA0079 # 02 Y:1986 02 1986 REPAIR OR REPLACE STEAM TRAPS $4,572 $600 Implemented
MA0079 # 01 Y:1986 01 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $478 $350 Implemented
MA0078 # 06 Y:1986 06 1986 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,610 $22,000 Implemented
MA0078 # 05 Y:1986 05 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $827 $240 Implemented
MA0078 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $100 Not Implemented
MA0078 # 03 Y:1986 03 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,530 $3,500 Implemented
MA0078 # 02 Y:1986 02 1986 REDUCE FLUID FLOW RATES $17,169 $20,900 Not Implemented
MA0078 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,650 $2,760 Implemented
TN0296 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,812 $25,175 Not Implemented
TN0296 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $6,477 $2,580 Implemented
TN0296 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,236 $0 Implemented
TN0296 # 04 Y:1986 04 1986 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,601 $0 Implemented
TN0296 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $853 $596 Not Implemented
TN0296 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,336 $260 Implemented
TN0278 # 06 Y:1986 06 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $348 $68 Not Implemented
TN0278 # 05 Y:1986 05 1986 USE MINIMUM STEAM OPERATING PRESSURE $382 $0 Not Implemented
TN0278 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $590 $682 Not Implemented
TN0278 # 03 Y:1986 03 1986 USE MINIMUM STEAM OPERATING PRESSURE $929 $420 Not Implemented