IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,139

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0160 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0160 # 02 Y:2008 02 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,048 $8,641 Not Implemented
MI0160 # 03 Y:2008 03 2008 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $16,476 $474 Implemented
MI0160 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,340 $15,475 Not Implemented
MI0160 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,705 $17,226 Implemented
MI0160 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,319 $24 Implemented
MI0160 # 07 Y:2008 07 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,440 $3,411 Not Implemented
UF0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,878 $27,259 Not Implemented
UF0407 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,924 $9,726 Implemented
UF0407 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,672 $762 Implemented
UF0407 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,409 $0 Implemented
UF0407 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $156,184 $102,044 Not Implemented
UF0407 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,021 $0 Implemented
UF0407 # 07 Y:2008 07 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $20,238 $21,568 Implemented
AM0536 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $26,800 $4,160 Implemented
AM0536 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $230 Implemented
AM0536 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $1,020 Not Implemented
AM0536 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $822 Implemented
AM0536 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $1,570 $0 Not Implemented
AM0536 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $480 Not Implemented
AM0537 # 01 Y:2008 01 2008 REPLACE BOILER $324,000 $300,000 Not Implemented
AM0537 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260,000 $750,000 Implemented
AM0537 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,100 $1,500 Implemented
AM0537 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,300 $25,000 Not Implemented
AM0537 # 05 Y:2008 05 2008 UPGRADE CONVEYORS $34,150 $80,000 Not Implemented