Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,912
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0900 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $273 | n/a |
AM0900 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $727 | $546 | n/a |
AM0901 # 01 Y:2024 | 01 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $16,101 | $4,000 | n/a |
AM0901 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,599 | $3,000 | n/a |
AM0901 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,877 | $327,235 | n/a |
AM0901 # 04 Y:2024 | 04 | 2024 | REDUCE FLUID FLOW RATES | $2,572 | $3,000 | n/a |
AM0900 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,310 | $69,700 | n/a |
AM0899 # 05 Y:2024 | 05 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $254 | $1,314 | n/a |
AM0899 # 04 Y:2024 | 04 | 2024 | REDUCE FLUID FLOW RATES | $1,045 | $3,000 | n/a |
AM0899 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,352 | $530,400 | n/a |
AM0899 # 02 Y:2024 | 02 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $711 | $23,638 | n/a |
AM0899 # 01 Y:2024 | 01 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $4,537 | $5,000 | n/a |
AM0897 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $100 | n/a |
AM0897 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $300 | $22 | n/a |
AM0897 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $460 | $98 | n/a |
AM0897 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $620 | $0 | n/a |
AM0897 # 04 Y:2024 | 04 | 2024 | USE PHOTOCELL CONTROLS | $520 | $102 | n/a |
AM0897 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,060 | $4,860 | n/a |
AM0897 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,400 | $32,265 | n/a |
AM0897 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,420 | $45,905 | n/a |
AM0894 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $500 | n/a |
AM0894 # 02 Y:2024 | 02 | 2024 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $735 | $1,300 | n/a |
AM0894 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $110 | $55 | n/a |
AM0894 # 06 Y:2024 | 06 | 2024 | USE SYNTHETIC LUBRICANT | $150 | $100 | n/a |
AM0894 # 05 Y:2024 | 05 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $335 | $0 | n/a |